This week’s activities:
- Limestone south Bldg. A
- Wood slats at Elevators
- Light poles
- Turf at amphitheater
- Structural steel for louver enclosures
- Formwork and rebar for sidewalks
Next week’s activities:
- Continue sidewalks at north and west of building
- Continue grading for sidewalks thru the building
- Continue louvers enclosures at cooling tower
- Continue entrance mats throughout the building